A contemporary 10-story office complex with sustainable design features
The initial phase involved clearing and leveling the 2-acre site. This included the demolition of any existing structures on the land. Soil testing was conducted to ensure suitability for building.
This phase involved pouring a reinforced concrete foundation complete with seismic reinforcements, which is crucial for structural integrity. Additionally, an underground parking structure was incorporated into the foundation design.
Erected steel framework for the 10-story structure with earthquake-resistant design.